-->

title-payback-predictor

Renewable UK

Evoco Frequently Asked Questions
Host a FREE Evoco Turbine and Share the Income With Evoco

bullet Imagine £250,000 for doing nothing! *
bullet NOTHING to invest
bullet NO RISK and no ongoing costs
bullet We need just 11m2 of your land per turbine
* Estimate based on 5 turbines in 7m/s mean wind with an RPI rate of 2.5%.


How It Works

As a leading manufacturer in the distributed wind industry, we sell our turbines globally with hundreds operating in the harshest of conditions. With a turbine proven in the field to deliver an excellent return on investment, it's only natural that we should operate some turbines ourselves.

Estimated Landowner Annual Income -
Mean Wind (m/s) Est. Single Turbine Income Est. Multi Turbine Income (Per Turbine)
6 £1,740 £1,570
6.5 £1,990 £1,795
7 £2,220 £2,005
7.5 £2,435 £2,200
8 £2,635 £2,370
(Income is dependent on the wind conditions experience on your site.)

Evoco Wind Harvesting Ltd owns and operates turbines sited on third party land, paying for the use of that land by sharing 20% of the Feed In Tariff income with the landowner.

Many people, interested in the fantastic returns available from small wind turbines, are deterred by the up front investment required, or the perceived technological risk involved. At Evoco Wind Harvesting, we offer an attractive, low risk, turnkey alternative to you -

  • NONE of the investment cost
  • NONE of the technology risk
  • NONE of the ongoing maintenance cost
  • 20 % OF OUR FEED IN TARIFF INCOME !!

What's In It For Me?

A partnership with Evoco Wind Harvesting is quite simple -

We provide -

  • All of the project and equipment costs
  • All of the maintenance costs
  • All of the expertise

You provide -

  • A minimum 20 year lease of approx. 25 square metres of your land per turbine we install
  • Access for installation
  • Limited access for periodic maintenance

You receive -

  • An index linked income worth up to £50,000 per turbine over the life of the project
  • 1 - 5 FREE turbines depending on the quality of your site, planning consents and your personal wishes
  • Unlike large scale wind farm development, you can still use your land for crops or pasture up to 5m from the turbine.

Is My Land Suitable?

As we have a limited number of our own turbines to install, and we share the income with you, our site requirements are more stringent than usual for an Evoco turbine. The primary criterion is wind resource. We need -

  • An open aspect, usually rural, which is free from major obstructions which would reduce the wind to the turbine.
  • A NOABL annual mean wind speed of 6.5m/s or above, OR
  • A measured annual mean wind speed of 5.5m/s or more.

There are numerous other criteria which are important to us, relating to planning, grid connection, access etc, but these are usually determined by a site assessor. You can help us to consider some of these criteria for your site if you register your interest, by clicking the link in the registration form to provide additional detail. (The form is below)


OK, I want one!     Register My Interest

Your Contact Details
























We receive a lot of enquiries about our FREE turbine offer. You can help your application get to the head of the queue by clicking here to provide additional details.

Install Of The Month
Latest News From Us

Evoco Customers Profit From Storms

Evoco Customers Profit From Worst Storms in 15 Years This week's arrival of hu...

Renewable Energy Icon more

Evoco Energy Ltd. St Pegs Mill   Thornhillbeck Lane, Brighouse, West Yorkshire, HD6 4AH   Email: info@evocoenergy.com   Telephone: +44 1484 475 800   Fax: +44 1484 475 802