Your Turbine Installed In 2 Days
  • Installation

    Site prior to installation - All components are delivered in advance to begin assembly.

  • Installation
  • Installation

    Foundations being prepared - Foundations are excavated to approx. 3.3m x 3.3m x 1.5m dependant on ground conditions.

  • Installation

    Turbine foundation steelwork being assembled.

  • Installation

    Fully assembled foundation structure being lowered into ground.

  • Installation

    Following levelling of foundation structure concrete is poured.

  • Installation

    Concrete filled and levelled - Requires approximately 2- 3 week curing period prior to turbine installation.

  • Installation
  • Installation

    Tower sections being installed. All towers are supplied in sections for ease of delivery.

  • Installation

    Turbines are installed using hydraulic power packs and rams for fast installation without the need for heavy lifting equipment. Turbines are typically raised in 5 mintues.

  • Installation

    Fully commissioned and operational.


How it works animationRegenerate View
A partnership built to lastRegenerate View

The Evoco 10kW turbine has undergone a four year period of R&D and in-house testing prior to being released to the UK market.

As a result, the Evoco 10kW can withstand harsh winters and wind speeds in excess of 90mph, and has been refined to suit the needs of all customers. As part of our commitment to continuous product improvement, the Evoco 10kW is certified under the UK's Microgeneration Certification Scheme, exceeding the requirements of MCS 006, MCS 010, BWEA Small Wind Turbine Performance and Safety Standard, and IEC61400 - 2.

The Evoco 10kW is a tried and tested machine which can be trusted to deliver dependable generation, year after year.

Install Of The Month
Latest News From Us

Evoco Customers Profit From Storms

Evoco Customers Profit From Worst Storms in 15 Years This week's arrival of hu...

Renewable Energy Icon more

Evoco Energy Ltd. St Pegs Mill   Thornhillbeck Lane, Brighouse, West Yorkshire, HD6 4AH   Email: info@evocoenergy.com   Telephone: +44 1484 475 800   Fax: +44 1484 475 802